The YKK project consisted of a 225,500-ft2 addition to the existing YKK plant in Dublin, Georgia. GEC provided geotechnical and construction quality control testing services to the design-build contractor, Dublin Construction, on this project. The project included cuts and fills on the order of 15 feet and was performed on a fast-track basis. GEC had personnel on site to administering soil density testing services while providing the geotechnical services on the project. Special features of this project included the undercutting, stabilization and filling of a wetland area as well as the creation of a deep on-site detention pond.
GEC now offers the convenience of paying your invoices online!